Following a road construction that created a clearance violation, TAWARA was tasked with engineering a solution for the 5L081 500kV circuit. After evaluating several options, our team designed a 5.5-meter lattice body extension to raise two existing Type 7A tangent towers. Using PLS-CADD and PLS-TOWER, we ensured the new conductor profile met all clearance standards under various weather loads without compromising the structural capacity of the towers or adjacent structures.

Remediation of 500 kV Transmission Line Clearance Violations

Client BC Hydro
Location British Columbia, Canada
Services: Structural Engineering, Transmission Line Engineering, PLS-CADD Analysis